Case Studies

Most Recent Case Studies

Osberstown Waste
Water Treatment Plant

Osberstown Waste Water Treatment Plant

Clean, repair and application of coating to internal walls and channels.

Somora Motor Parts,
Dublin

Somora Motor Parts, Dublin

Vacuum blast and paint 3,500 m2 of warehouse floors.

Shrewsbury Square,
Dublin

Shrewsbury Square, Dublin

Vacuum blast, paint and install new markings to 2,800m2 of underground car park

Clontarf Bridge,
Cork

Clontarf Bridge, Cork

Shot blast removal of old paint and full repaint of entire structure

Resin Flooring and Car Parks

Transaero,
Shannon, Co. Clare

Aer Lingus Floor

1,000m2. Vacuum blast floor and apply non-slip, chemical resistant epoxy resin flooring system.

L3 Communications,
Co. Clare

L3 Communications

1,500m2. Vacuum blast floor and apply coloured sealer, including walkways.

Mullingar Autos,
Co. Westmeath

Mullingar Autos

1,300m2. Vacuum blast floor and apply non-slip, chemical resistant epoxy resin flooring system.

Waterproofing and Chemical Containment

Hynes Yard Car Park,
Top Deck, Galway

Hynes Yard

1,300m2. Removal of existing coating and application of flexible, water proofing epoxy coating.

Water Treatment Plant, Athy

ESB Power Station

Storage bund. Apply chemical resistant coating to internal of storage bund.

Waste Water Treatment Plant, Castlebar, Co. Mayo

Waterproofing

Effluent tanks from pharmaceutical plant. Shot blasting of internal surfaces and application of chemical resistant and flexible liner.

PC Coatings

Lime Silos, ENVA,
Shannon and Portlaoise

Lime Silos Enva Shannon and Portlaoise

Full scaffolded encapsulation. Shot blasting to remove existing coating and rust, to SA 2.5. Application of C5 classified protective coating.

RNLI Berthing Station,
Isle of Mull, Scotland

Tobermory

Full scaffolded encapsulation. Shot blasting to remove existing coating and rust, to SA 2.5. Application of C5 classified protective coating.

Rossaveel Marina,
Co. Galway

Rossaveel

Shot blasting to remove existing coating and rust, to SA 2.5. Application of C5 classified protective coating.

Fire Protection

Delta Business Park, Limerick

Fire Protection

Application of 1 hour fire protection to structural steel.

NRA Salt Barn,
Ennis, Co. Clare

Salt Barn

Application of 1 hour fire protection to structural steel.

Moneypoint Power Station, Co. Clare

Fire Protection

2 hour fire stopping to wall and floor openings.

Reservoir Repair and Maintenance

Dunshaughlin,
Co. Meath

Water Tower

45m high water tower. Reinstatement of concrete plinth. Protective coating to dome.

Castlewarden,
Co. Kildare

Castlewarden

Underground reservoir. New build. Line internal surface with DWI approved material.

Ballina,
Co. Tipperary

Ballina

Underground reservoir. Power wash internal surface. Repair cracks. Line internal surface with DWI approved material.

Surface Preparation

Lime Silos, ENVA,
Shannon and Portlaoise

Lime Silos Enva Shannon and Portlaoise

Full scaffolded encapsulation. Shot blasting to remove existing coating and rust, to SA 2.5. Application of C5 classified protective coating.

RNLI Berthing Station,
Isle of Mull, Scotland

Tobermory

Full scaffolded encapsulation. Shot blasting to remove existing coating and rust, to SA 2.5. Application of C5 classified protective coating.

Rossaveel Marina,
Co. Galway

Rossaveel

Shot blasting to remove existing coating and rust, to SA 2.5. Application of C5 classified protective coating.

 

Industry Sectors We Cater For …

Pharmaceutical and Medical Devices

Pharmaceutical and Medical Devices

  • Packaging Line
  • Laboratories
  • Clean Rooms
  • Animal Holding Areas
  • Gowning Rooms
  • Blending Rooms
  • Processing areas
  • Lobbies
  • Hallways
  • Plant Rooms
  • Sub-Stations
  • Chemical Storage
  • Tanks/Bunds/Rooms
Educational

Educational

  • Classrooms
  • Locker/shower rooms
  • Cafeterias
  • Corridors
  • Research Laboratories
  • Engineering Workshops
  • Plant Rooms
  • Sub-Stations
  • Chemical Storage
  • Tanks/Bunds/Room
  • Training Facilities
Commercial

Food Processing

  • Mixing/Blending Areas
  • Bottling Lines
  • Poultry Processing
  • Seafood Processing
  • Bakery & Confectionery
  • Dairies
  • Meat Packing
  • Cold Storage
  • Meat Processing Plants
  • Abattoirs
  • Meal Preparation Areas
Healthcare

Healthcare

  • Laboratories
  • Clean Rooms
  • Gowning Rooms
  • Lobbies/Hallways
  • Cafeterias
  • Plant Rooms
  • Sub-Stations
  • Chemical Storage
  • Tanks/Bunds/Rooms
  • Operating Theatres
  • Morgues
Public

Public

  • Local Authorities
  • County Councils
  • Port Authorities
  • Water Treatment Plants
  • Fuel Storage Facilities
  • Railway Station
  • Churches
  • Waste Water Treatment Plants
Hotels

Hotels

  • Lobbies
  • Hallways
  • Kitchens
  • Swimming Pools
  • Gymnasiums
  • Locker/shower rooms
  • Leisure Centres
Marine

Marine

  • Boats
  • Jetties
  • Piers
  • Cranes
  • Bridges
  • Pontoons
  • Lock Gates
  • Dams
  • Buoys
  • Tank Farms
  • Pipe Harbours
  • Piles
 

Procedures

Application Procedures

  • Floor Systems
  • Surface Coating
  • Fire Protection
  • Shot Blasting
  • Surface Preparation
  • Waterproofing

Systems Compliance

  • Drink Water Inspectorate
  • Water Regulations Advisory Scheme
  • REACH Compliance
  • C.E. Certified
  • Nuclear Industry Approved
  • BS476-Fire Protection
 

Suppliers

Protega Coatings Jotun Teknos
 

ON SITE consultation to evaluate site specific performance requirements, ensuring that we have a clear understanding of your needs and current site conditions.

OFF SITE meeting with technical and design partners to decide on the most appropriate system and available options. Our goal is to provide all our clients with the most suitable and cost-effective solution.

COMPLETE PROPOSAL and forward details to the client, outlining all works that need to be carried out, supplying all relevant technical data, and a detailed quotation.

HEALTH AND SAFETY assessment and compilation of appropriate site-specific safety procedures.

PRE-COMMENCEMENT site visit to ensure work can commence on time, keeping any delays to a minimum.

PREPARE AND PRIME relevant area.

APPLY coating (layers if necessary).

MAINTENANCE programme designed, where required.

POST application site visits to monitor performance of coating.

CONTACT US

* Your details will be used to correspond with you
   and never shared without your consent.

website by shavac bawn consultancy
Top